Seven Billion AnalyticsContact Us

Demand forecasting for mid-size companies: how to improve accuracy and choose the right approach

Demand forecasting for mid-size companies: how to improve accuracy and choose the right approach

Demand forecasting for mid-size companies: how to improve accuracy and choose the right approach

A calm wheat field at soft sunrise, with a cluster of trees on the horizon under a pale sky.

Ready to move from pilot to production?

Let's talk about where you are today — and how we can help you scale AI that actually delivers.

Book a Discovery Call

Forecast at the SKU and location level. Measure accuracy and bias with the same metric every cycle. Add only the signals that prove their value, and pick the tool your data and team can keep running. ERP modules, packaged software and custom models each fit a different situation. This guide shows how to tell which one fits yours.

It is written for CFOs, COOs and heads of supply chain or demand planning at manufacturers and distributors in the Rs 1,000 to 2,000 crore range, in India and the US. If you are still moving planning off gut feel, start with data-driven demand planning. If your forecast is fine but stock decisions still go wrong, read the forecast was accurate, the inventory decision was still wrong. This post is about measuring, choosing and testing.

How do you measure demand forecast accuracy?

Use one error metric and one bias metric, at the level where you make decisions, every cycle. WAPE suits most mid-size portfolios because it weights errors by volume. Add bias to see if you over- or under-forecast, and forecast value add to see which steps help.

Cheat sheet of four forecast metrics: MAPE, WAPE, bias and forecast value add, with the formula, best use and main trap for each.

MAPE (mean absolute percentage error). The average of each item’s error as a percentage of its actual. It is easy to explain, but it breaks down when actuals are zero or close to zero, and small items can swamp it (Forecasting: Principles and Practice).

WAPE (weighted absolute percentage error). The sum of absolute errors divided by the sum of actuals (AutoGluon metrics guide). Big items count more, which matches how stock and cash work.

Bias. The net error: total forecast minus total actual, divided by total actual. Positive means you over-forecast. Negative means you under-forecast. A forecast can have low error and still lean one way every month.

Forecast value add (FVA). SAS defines FVA as “the change in a forecasting performance metric” that “can be attributed to each particular step and participant” in the process, compared with a naive forecast (SAS white paper). It tells you whether the model, the planner override and the sales input each made the forecast better or worse.

A worked example. These numbers are illustrative only. They are not a benchmark or a client figure.

SKU (illustrative)

Actual

Forecast

Absolute error

Error as % of actual

A

100

90

10

10%

B

50

60

10

20%

C

5

15

10

200%

Total

155

165

30

  • MAPE = (10% + 20% + 200%) / 3 = about 77%. SKU C, the smallest item, dominates.

  • WAPE = 30 / 155 = about 19%. Each unit of error counts the same.

  • Bias = (165 minus 155) / 155 = about +6%. A slight over-forecast.

Now FVA, with illustrative WAPE figures: a naive forecast scores 30%, the statistical model 24%, and the model after consensus overrides 26%. The model added 6 points. The overrides took 2 away. That is a conversation worth having.

Measure at the level of the decision. If you buy and stock by SKU and warehouse, measure there, at the lead time you plan on. Accuracy at national, monthly level hides the errors that cause stockouts.

Why forecasts miss in mid-size companies

Most misses come from four places: forecasting at too high a level, promotions and new products, intermittent demand, and data spread across the ERP, distributor systems and spreadsheets. Better software helps with some of these. Better data and process fix the rest.

Aggregate-level forecasts. A forecast by product family or region can look accurate while each SKU at each location is wrong. Errors cancel in the total.

Promotions and new products. History does not show next month’s scheme or a launch with no sales yet. Without event data, the model guesses.

Intermittent demand. Many spare parts and long-tail SKUs sell in odd bursts with zeros in between. Standard methods struggle here, and specialised methods such as Croston’s method exist for it (Forecasting: Principles and Practice).

Split data. Orders in the ERP, secondary sales in a distributor system, promotions in a spreadsheet. If nobody joins them, the forecast only sees part of demand.

Seven ways to improve forecast accuracy

Start with the data, then the structure, then the process. Clean history and a proper SKU-location hierarchy usually matter more than the choice of algorithm. Track every change with FVA, so you keep what helps and drop what does not.

  1. Clean history and fix stockout-censored demand. When an item was out of stock, sales understate demand. Flag those periods and adjust them, or the forecast learns to under-forecast.

  2. Build a SKU-location hierarchy. Forecast at SKU and location, then add up to region and total, so every level agrees. Hierarchical methods reconcile the levels (Forecasting: Principles and Practice).

  3. Segment by demand pattern. Steady, seasonal, lumpy and new items need different methods and different review effort.

  4. Add promotion and event signals. Schemes, price changes, festivals, launches and delistings. Keep one that improves FVA in a test. Drop one that does not.

  5. Track consensus overrides with FVA. Let sales and planners adjust, but record every override and measure whether it helped.

  6. Set a refresh cadence. Refresh as often as you can act. A weekly forecast is wasted if orders are placed monthly.

  7. Review by exception. Planners should look at the items with the biggest errors, biggest bias or biggest value at risk, not every line.

Step 0, before any of this, is joining the data. One example from our work: for a global food and beverage company, we merged 15+ data sources into one executive command centre, cutting manual reporting effort 60%. That kind of unified layer is what a forecast needs underneath it.

ERP module vs packaged software vs custom model

An ERP module suits stable, simple demand and a team that wants one system. Packaged planning software suits firms that want proven features without building. A custom model suits firms whose demand drivers, data mix or decisions do not fit a standard tool. Many mid-size firms end up with a mix.

ERP forecasting module

Packaged planning software

Custom model

Main cost drivers

Licence or add-on, configuration, data clean-up

Subscription, integration with ERP, configuration, training

Build, data engineering, hosting, ongoing model care

Time to value

Depends on how clean ERP history is

Depends on integration and data readiness

Depends on data readiness and scope of the first use case

Fit with SAP, Infor LN, Dynamics

Native to that ERP

SAP, Infor and Microsoft each offer planning products; third-party tools connect through APIs or files

Reads from and writes back to any ERP through its interfaces

Flexibility

Lowest: you use what the module offers

Medium: configurable within the product

Highest: built for your drivers and decisions

Skills needed

ERP functional team, planners

Planners, a system admin, a vendor or partner

Data engineers and data scientists, in-house or partner

What the ERP vendors document:

  • Microsoft Dynamics 365 Supply Chain Management has built-in demand forecasting that generates a statistical baseline, lets planners adjust it and tracks forecast accuracy KPIs. Microsoft notes it “might not be the best fit” for industries such as commerce or wholesale, and points to its newer Demand planning product (Microsoft Learn).

  • SAP sells SAP Integrated Business Planning, a cloud planning product with demand planning, demand sensing and statistical models (SAP IBP).

  • Infor offers Infor Demand Planning as a supply chain planning product (Infor).

We do not publish prices or timelines here. They depend on your data, scope and agreements, so get them in writing from each option, against the same scope.

What to look for in demand forecasting software

Look for software that forecasts at your real level of detail, explains its numbers, measures its own value and writes back to your ERP. Then check who owns the data and where it runs. A good demo on clean sample data proves little. Test on yours.

A buyer’s checklist:

  • Hierarchy support. SKU, location, customer or channel, with totals that reconcile.

  • Explainability. Planners can see why a forecast moved: trend, season, promotion or event.

  • FVA tracking. Built-in comparison of naive, model and overridden forecasts.

  • Intermittent and new-item handling. Separate methods, not one model for everything.

  • Scenario handling. What-if views for promotions, price changes and supply limits.

  • ERP write-back. Approved forecasts flow into planning in SAP, Infor LN or Dynamics through supported interfaces.

  • Data ownership and hosting. Your data stays yours, can be exported, and runs where your policies allow.

  • Ease of daily use. Exception lists planners will actually open each morning.

Our ForecastNow accelerator and Demand and Supply Intelligence accelerator are built around this list. For the modelling basics, see predictive analytics using machine learning.

How to run a fair pilot

Pick one category or region, hold out a recent period, and compare the current forecast with the new one on the same metric. Decide within 60 to 90 days. A fair pilot uses your data, your level of detail and your lead time, not the vendor’s best case.

Pilot timeline in four steps: freeze the baseline, test on a holdout period, compare on WAPE and bias, then decide, within 60 to 90 days.

The steps:

  1. Pick the slice. One category or region with enough volume and some hard items: promotions, lumpy demand, a few new SKUs.

  2. Freeze the baseline. Record your current forecast for the same SKUs, locations and periods.

  3. Hold out a period. Hide the most recent months from the new model, so it forecasts data it has not seen. Testing on data not used to fit the model is the reliable way to judge accuracy (Forecasting: Principles and Practice).

  4. Compare on one metric. WAPE and bias, at SKU-location level, at your planning lead time. Same rules for both forecasts.

  5. Run it live. Forecast forward for a few cycles alongside the current process.

  6. Decide. Keep, change or stop, based on the numbers and on whether planners use it.

Two warnings. Do not let either side tune on the holdout period. And do not judge on total-level accuracy alone.

From forecast to decision

A better forecast only pays when it changes an order. The next step is turning forecasts into safety stock, reorder points and purchase orders. We covered that in the forecast was accurate, the inventory decision was still wrong and in our guide to reducing inventory carrying cost.

Two examples from our work show the forecast reaching a decision:

  • A food-service distributor in India was losing margin to perishable shrink and next-day reports that forced emergency buys. We built live stock dashboards with a freshness view for every item, and when the forecast flags low stock, a reorder is raised in their Microsoft Dynamics NAV. The result: 18% less perishable wastage. More on our ERP implementation and modernisation page.

  • A snacks FMCG maker lifted distributor SKU penetration 15% with a next-best-SKU model above 75% precision. That precision figure measures how often the model’s SKU recommendations were right. It is not a forecast-accuracy figure.

For the wider planning picture, see our supply chain optimisation work, and our manufacturing and retail and FMCG pages.

Data flow: ERP orders, distributor sales and external signals are cleaned and joined, forecast by SKU and location, reviewed by planners, and written back to the ERP as approved orders.

Talk to us

If you are choosing a forecasting approach, or your current one is not trusted, start with Phase 0. Phase 0 is a two-week discovery that tells you exactly which problems AI can solve, what it will take to build, and what it will cost. No obligation beyond it. Book a discovery call.

FAQ

What is a good forecast accuracy for a mid-size company?

There is no single number. Accuracy depends on the level you measure at, the horizon and the demand pattern. A national monthly forecast will always look better than a SKU-by-warehouse weekly one. Benchmark against your own baseline and a naive forecast, at your decision level, and track the trend.

MAPE or WAPE, which should we use?

For most mid-size portfolios, WAPE. It weights errors by volume, so a few small items cannot swamp the score, and it copes with zero-sales periods better than MAPE. Use MAPE only for steady, high-volume items where every actual is well above zero. Always pair either one with bias.

Can we forecast inside SAP, Infor LN or Dynamics?

Yes, to a point. Each vendor offers forecasting or planning products, and some are built into the ERP. Check whether they handle your hierarchy, promotions and intermittent items. If not, forecast outside the ERP and write approved forecasts back through its interfaces. The ERP stays the system of record.

How much history do we need?

Enough to see your seasonal pattern at least twice, where seasonality matters. Steady items need less. New items have none, so they need a different method. Clean, consistent history beats long but messy history. Fix stockout periods and code changes first.

How do we forecast new products?

Use what you know before launch: similar past products, planned distribution, price and promotion plans. Start from a like-for-like item or a launch curve, then switch to the item’s own sales as data builds. Review new items weekly at first, and track their error separately.

Does AI forecasting replace planners?

No. It takes over the routine baseline across thousands of SKU-location pairs, so planners can spend time on exceptions, promotions, new launches and supplier issues. FVA keeps both honest: it shows where the model helps and where a planner’s judgement adds value.

The lowest-risk way to find out if AI is right for your business.

Phase 0 is a two-week discovery that tells you exactly which problems AI can solve, what it will take to build, and what it will cost. No obligation beyond it.

ABOUT Seven Billion

Seven Billion is an Applied AI company — a team of data scientists and AI engineers who build and deploy AI systems that run in production.

OFFICE

World Tech 83, First Floor, IT City, Mohali 140603

The lowest-risk way to find out if AI is right for your business.

Whether you are mapping your first AI use case or scaling AI across the enterprise, we will help you cut through the noise and build something that actually ships.

ABOUT Seven Billion

Seven Billion is an Applied AI company — a team of data scientists and AI engineers who build and deploy AI systems that run in production.

OFFICE

World Tech 83, First Floor, IT City, Mohali 140603

Intelligence that delivers starts here.

Whether you are mapping your first AI use case or scaling AI across the enterprise, we will help you cut through the noise and build something that actually ships.

ABOUT Seven Billion

Seven Billion is an Applied AI company — a team of data scientists and AI engineers who build and deploy AI systems that run in production.

OFFICE

World Tech 83, First Floor, IT City, Mohali 140603