Most freight savings come from better decisions, not harder haggling. Choose the right carrier and rate, consolidate part loads, route smarter and audit every invoice. All four need shipment, rate and ERP order data joined in one place. Without that, each decision is made on a hunch, one load at a time.
This guide is for CFOs, COOs and heads of logistics at manufacturers and distributors in the Rs 1,000 to 2,000 crore range, in India and the US. It covers where freight cost leaks, the data you need first, five levers, and a 60 to 90 day plan to start.
Where does freight cost leak?
Freight cost leaks in five places: spot buys, part loads, empty return miles, surcharges nobody checks, and expedites caused by late planning. None of them shows up as one big line. Each is a small, daily decision that adds up over a year.

Spot buys. A truck is booked at the last minute, off contract, at whatever rate the market offers that day. If spot buying is routine, the contract rates are not doing their job.
Part loads. Trucks leave half full because orders were dispatched as they came, not grouped by lane and date. You pay for space you did not use.
Empty return miles. A vehicle delivers and comes back empty. On dedicated or own fleets, that cost is yours, whether you see it or not.
Unverified surcharges and detention. Fuel surcharges, waiting charges, extra stops and other accessorials get added to invoices. If nobody checks them against the contract and the actual trip, they get paid.
Expedites caused by late planning. A production delay or a missed dispatch slot turns a standard shipment into an urgent one. Freight pays for a planning problem.
What data do you need first?
You need four data sets joined on the shipment: ERP orders and dispatches, carrier rate cards, freight invoices, and GPS or telematics where you have it. Then you need simple checks to make sure the data can be trusted. Most of the work is in the joining, not the analysis.

ERP orders and dispatches. What was ordered, from where, to where, how much, by when, and when it actually left.
Carrier rate cards. Contract rates by lane, vehicle type and weight band, plus agreed surcharge rules. These often sit in spreadsheets or email, so collect and version them.
Freight invoices. What each carrier billed, line by line, including accessorials.
GPS or telematics. Actual routes, stops, arrival and waiting times. If you do not have it, start without it and add it later.
Quality checks to run before anything else:
Every invoice matches a shipment, and every shipment matches an order.
Weights, units and locations are consistent across systems.
Each lane has a current rate card, with a valid-from date.
Delivery addresses map to clean, geocoded locations.
For more on why timely data matters here, see supply chain visibility: why real time still beats real good.
Lever 1: Rate and carrier selection
Pick the carrier and rate per shipment from a full view of contract rates, service history and current capacity. Do not default to the usual carrier. The goal is the lowest total cost that still meets the delivery promise, not the lowest rate on paper.
What this looks like in practice:
Compare every eligible carrier per lane on contracted rate, past on-time performance and claims.
Track spot buys by lane. If one lane keeps going to spot, renegotiate it or add a carrier.
Use your own data in rate talks. Volume by lane, seasonality and service history give you a stronger case at renewal.
One example from our work: “A logistics tech firm cut client shipping spend 25% on average, gave each analyst 4x the accounts and shrank savings assessments from 8 weeks to 3 days.” Read the automated rate and route engine case study.

Lever 2: Consolidate part loads into full loads
Group orders going the same way into fewer, fuller loads. Part loads (LTL) usually cost more per kg than full loads (FTL), so the question is how long an order can wait to share a truck. Answer it with delivery promises, not habit.

How to do it:
Group open orders by lane and delivery window. Daily, from the ERP.
Set a hold rule. For example, an order can wait for the next consolidated dispatch if its promise date allows. Agree the rule with sales.
Build loads to vehicle capacity. By weight and volume, not just by count.
Compare cost both ways. Part load now versus full load later, including any service risk.
Review exceptions. Planners approve the loads that break the rule, not every load.
Consolidation also cuts handling and paperwork, and it often cuts empty miles on the way back.
Lever 3: Route and multi-stop optimisation
Plan routes and stop sequences from real locations, time windows and vehicle limits, not from a fixed route list. For distributors running many drops a day, better sequencing cuts distance and driver hours. It also makes delivery times more reliable.
Inputs that matter:
Geocoded customer locations and delivery windows.
Vehicle capacity, type and any restrictions by road or time.
Service times at each stop, learned from GPS history where you have it.
Backhaul options, so return trips carry something.
Route optimisation is where a solver earns its place. With dozens of stops and several vehicles, the number of options is far beyond what a planner can compare by hand. Our transportation optimisation accelerator is built for this.
Lever 4: Freight invoice and accessorial audit
Check every invoice against the contract rate, the actual shipment and the trip record before you pay. Catch overcharges, duplicate bills and surcharges with no evidence behind them. In our view, audit is the fastest lever to start, because it needs no change in operations.
What to check on every invoice:
Base rate matches the rate card for that lane, vehicle and date.
Weight and distance match the shipment and the trip.
Fuel surcharge follows the agreed formula.
Detention and waiting charges match GPS or gate times.
Extra stops actually happened.
Duplicates. The same shipment billed twice, or billed by two carriers.
Automate the matching and send only the exceptions to a person. Feed disputes back into carrier scorecards, so audit also improves Lever 1.
Lever 5: Fix the upstream cause
Many expedites are planning failures that freight pays for. If production runs late or dispatch is planned at the last minute, no freight team can save the cost. Fix the schedule, and the urgent shipments shrink.
Where to look:
Production schedules that slip and push orders into urgent dispatch. See how mid-size manufacturers schedule production with AI.
Dispatch planning done on the day, with no view of tomorrow’s orders.
Stock in the wrong place, leading to transfers between warehouses that could have been avoided.
Order cut-off times that sales overrides without seeing the freight cost.
Tag every expedited shipment with a reason code. Within a few weeks, the pattern tells you which upstream fix pays back first.
Where AI and optimisation help, and where simple rules are enough
Use optimisation where there are too many options to compare by hand: routing, multi-stop planning and load building. Use simple rules for audit checks, hold rules and carrier defaults. AI forecasting helps upstream, by predicting volumes by lane so you can book capacity early.
Where AI and optimisation help:
Route and stop sequencing across many vehicles and time windows.
Load building by weight and volume.
Forecasting volumes by lane, so contract and capacity match demand.
Flagging invoice lines that look unusual against history.
Where simple rules are enough:
Matching invoices to rate cards.
Hold rules for consolidation.
Flagging spot buys and expedites for review.
Carrier defaults for low-volume lanes.
Start with rules. Add optimisation where the rules leave money on the table. Our supply chain optimisation work covers both.

A 60 to 90 day starting plan
Start with one lane or one region, set a baseline, run a pilot and measure. Audit and spot-buy tracking can start in the first weeks. Consolidation and routing follow once the data is joined.
A simple plan:
Pick the slice. One region or a handful of high-spend lanes.
Join the data. Orders, dispatches, rate cards and invoices for that slice.
Baseline it. Freight cost per kg and per unit, spot share, load fill and expedite count.
Run audit first. It needs no change in operations.
Pilot consolidation and routing. Run new plans beside the old ones, then switch.
Measure and review with finance. At the end of the window, decide whether to roll out to the next region.
If you run plants, our manufacturing page shows how this links to production. Distributors and 3PLs can see our logistics work. If containers are part of your network, see ContainerOS for container inventory.
Talk to us
If freight is growing faster than volume, start with Phase 0. Phase 0 is a two-week discovery that tells you exactly which problems AI can solve, what it will take to build, and what it will cost. No obligation beyond it. Book a discovery call.
FAQ
What is a good way to measure freight cost: per kg, per unit or as a percentage of sales?
Use more than one. Cost per kg or per tonne-km shows how efficiently you move weight. Cost per unit shipped links freight to product margin. Freight as a percentage of sales is useful for the board but moves with prices and mix. Track all three by lane and region, and set targets against your own baseline.
FTL vs part load: when should we consolidate?
Consolidate when orders going the same way can wait for a shared truck without breaking the delivery promise. Compare the part-load cost now with the full-load cost later, plus any service risk. Agree a hold rule with sales so planners do not decide case by case.
Do we need a TMS to start?
No. You can start with ERP data, rate cards and invoices joined in one place, plus audit rules and a consolidation report. A transport management system helps once you plan many loads a day. Start with the data, then decide what system you need.
Can this run on our existing ERP (SAP, Infor LN, Dynamics)?
Usually, yes. The freight data layer reads orders and dispatches from the ERP, and approved plans can go back through the ERP’s own interfaces. The ERP stays the system of record. The analysis and optimisation sit beside it.
How do we verify detention and surcharge claims?
Check each claim against evidence. Match detention to GPS or gate in and out times. Match fuel surcharges to the formula in the contract. Match extra stops to the trip record. Pay what the evidence supports, dispute the rest, and track dispute rates in carrier scorecards.